Testimonials

Managing Director, Furniture World

“This is the third mezzanine floor we have asked Hi Level to do, the first and second one we had other quotes and both times Hi-Level offered the best deal. Whilst price was a deciding factor, your service was too. From original point of contact with Neil through to the design work with Jason, it was excellent. SO very helpful especially with someone like myself with little knowledge on mezzanines, I would highly recommend Hi-Level”.

Brent Lodge Wildlife Hospital

“Great work, great team, thank you!”.

Contracts Director, Stodec Ltd

“Very pleased with the attention to detail, a high level of Health and Safety throughout the project, thanks for delivering a great job”.

Celtic Bakers

“Very, very impressed with the mezzanine, the quality and feel is excellent. Thank you Hi-Level and the team for your patience”.

Animed Veterinary Hospital

“Incredible fitting team”.

Branch Manager, UTI

“I used Hi-Level to install a two tier mezzanine structure with fire protection and staircase enclosures. Hi-Level conducted themselves with utmost professionalism whilst on site, our health and safety policies were adhered to the letter and the finish was to a very high standard, to specification and within budget”.

Managing Director, KAPCO UK

“From launch Hi-Level’s design flare, knowledge of what could be realistically possible at a sensible cost and their innovation helped us achieve a really robust functional design for our 30 year old facility” .

Director, Office Builders

“First rate build quality, prompt friendly service with excellent attention to detail”.

Box Litho

“I am absolutely delighted with the job, the floor is exactly what I had hoped it would be and the efficiency in managing the project has been excellent from start to finish. Hi-Level is to be commended on every level and stands as a lesson to us in how to run a successful business”.

Managing Director, Stodec Ltd

“The structure looks excellent and the customer is very pleased”.

Guildprime Specialist Contracts Ltd

“The job was completed very efficiently and in a professional manner.”

Director, Davies Turner & Co Ltd

“Davies Turner have been provided with a perfect solution to our additional floor space requirements delivered on time, on budget and with minimal disruption for such a large mezzanine project in a busy warehouse, our time frame was absolutely critical”.

Network Development Project Manager, Tesco

“It’s the first time Tesco have used Hi-Level and I have been very impressed with their approach from start to finish on the project, the product is robust, reliable and has a good quality finish, I would strongly consider using Hi-Level in the future” .

General Manager, Vasanta

“The lines of communication were excellent, especially the build team on site, if something was found to be compromising, a solution was always found and mutually agreed by both parties”.

Managing Director, ASAP International

“The guys doing the build were very efficient and worked very well. I felt we were kept informed of what was going on. The whole the project went very well and now we’re getting used to the new space”.

Project Manager, Logistics Company

“It was their willingness to engage with us to identify the project requirements and to make positive suggestions which finally convinced us that Hi-Level were the right partner for this critical project”.

Acro Environmental  

“The Hi-Level team have been helpful and efficient on this project – they have delivered a 1st class installation”.

Absolute Music

“This project has run smoothly and delivered us a showroom we are proud of. We are very pleased with the results”.

Orchard Group

“Mezzanine completed, great job and quickly installed!”

James Sherlock 

“Professional and hard-working installation team”