The Challenge

To supply, deliver and install a single tier mezzanine floor complete with a general access staircase, double mid landing and handrail for DKNY.

The Criteria

Hi-Level Mezzanines Ltd and the distributor were required to supply, delivery and install a 128m2 floor for an international retail client. They had to produce a solution for working within a site that had not only restricted access, but other issues associated with working within the confines of a shopping mall. The floor specification was needed to support a 4.8kn/m2 loading and was required to have a finished floor level of 3.980m. Stability was achieved through portalised sway frames so not to restrict free movement below the mezzanine with vertical bracing

The Solution

Due to the restrictions onsite Hi-Level used a fork truck to offload the materials and used a genie lifting device for the installation because of the tight confines of the shopping mall.

The Result

The mezzanine floor was completed in September 2014 after 3 days onsite. The project was completed on time and within budget. The Hi-Level Project Manager said ‘This was a project with a quick turn around, delivered on time and on budget for an international retail client. We were pleased with the final result and happy that the client appreciated our professionalism and efficient working manner”.

Hi-Level Mezzanines distributor, saidThe job was completed very efficiently and in a professional manner’.

 

Please get in touch with our sales team if you have any questions regarding previous projects.

Budget Calculator

Receive a competitive price using our precise budget generator

Budget calculator

Quote Request

Receive a detailed quote from our estimators

Request a quote

What our clients say

“Hi-Level’s willingness to engage with us to identify the project requirements and to make positive suggestions which finally convinced us that they were the right partner for this critical project”.
Logistics CompanyProject ManagerLogistics Company

Latest Tweets

Follow