The Client & Challenge

Building contractor Magrock invited Hi-Level to tender for this particular floor after being dissatisfied with a previous mezzanine floor supplier, who failed to meet their requirements. The end client, Clipper Logistics, are a UK leading logistics solutions company.

The Criteria

Clipper Logistics required the mezzanine floor within a new distribution centre for one of their clients.

The final requirements of the project were detailed as follows:

  • Mezzanine Floor – 34m x 12m
  • Featuring 1 extra width general access staircase and 1 galvanised utility escape staircase
  • Side mounted handrail painted to the clients specification
  • Chamfered and countersunk fixing in base plates

The Solution & Result 

Despite delivery and installation being on a tight timescale, the build program was completed over a period of 9 days, finishing in December 2017.

“Hi level were appointed to carry out a single story extension within a live warehouse environment.  The project was delivered on time and to a high standard throughout.  This was our first project with Hi level and we would not hesitate using them again as their attitude from tendering the project through to completing the works was second to none.  Thank you to everyone involved” David Brewer, Construction Director – Magrock

Take a look at the finished product below:

Please get in touch with our sales team if you have any questions regarding previous projects.

Budget Calculator

Receive a competitive price using our precise budget generator

Budget calculator

Quote Request

Receive a detailed quote from our estimators

Request a quote

What our clients say

“I used Hi-Level to install a two tier mezzanine structure with fire protection and staircase enclosures. Hi-Level conducted themselves with utmost professionalism whilst on site, our health and safety policies were adhered to the letter and the finish was to a very high standard, to specification and within budget”.
UTIBranch ManagerUTI

Latest Tweets

Follow