The Client
On this project Hi-Level worked in partnership with AJR Office Interiors.
AJR Office Interiors have more than 25 years of experience in office design and fit out. They deliver high-quality fit-out projects, tailored to suit client’s requirements and transform workspaces.
The end client for this project was Prism eLogistics. Based in Basingstoke, Hampshire they provide storage, fulfilment, pick & pack and distribution solutions and were established in 2020.


The Challenge
When Prism e-Logistics decided to take on a new warehouse facility in Basingstoke they were looking for a local supplier to manage the project and AJR Office Interiors were the perfect choice with their experience and nearby head office.
The new site was one large open plan warehouse space initially but for the client a mezzanine, to maximise warehouse space, and office fit out, to suit their business requirements, were going to be must-haves.
The Criteria
This mezzanine part of the project included several key design elements to suit the client’s operations. The primary challenge was creating a mezzanine solution that would accommodate the large sleeving and packaging machinery that was to be housed underneath the mezzanine floor. The client needed as few columns as possible under the mezzanine to allow plenty of space for the machines without the need for additional ground works.
In addition to the design work the project itself had to be completed within a tight time frame to allow AJR Office Interiors adequate time for follow on works and to hit the overall deadline for the client to be operational in their new building.
Specifications
- Single tier.
- Over 440m2
- Storage
- General Access Staircase and Landing
- Edge Protection
- 2 x Pallet Gates and Loading Plates


The Result
Following the mezzanine floor installation AJR Office Interiors have completed office fit out works as well as the creation of WCs and break out areas. Below the mezzanine, Prism e-Logistics have plenty of space for their machinery for labelling, shrink wrapping and packaging and on the mezzanine, they have ample new storage space.
The client has now been operational in their new facility for several months and they are very pleased with the overall end solution.
Despite covering the whole of the UK, Hi-Level are always pleased to support local businesses, and we are proud to have worked on this project with two fellow Hampshire based companies.


Testimonial
“The design process was very good with Hi-Level creating a solution that met all of our client’s needs for the usage of areas both below and on the mezzanine floor.
We had a tight deadline on this project which required the mezzanine and fit out works to be completed on time. We have achieved this and the client is very pleased with the end solution.”
Rachael Hussey, Design and Compliance Manager – AJR Office Interiors