How is a mezzanine floor structurally supported?

Summary

A mezzanine floor is supported by a steel frame of columns and beams that carries the deck and transfers every load down to the building’s ground floor slab. In most industrial installations the structure is freestanding, fixed to the slab through base plates rather than supported by the building’s own frame. Whether the slab, and the ground beneath it, can carry the resulting column loads is usually the deciding factor in the design.

Contents

What are the main structural parts of a mezzanine floor?

A mezzanine floor has four main structural parts: columns, primary beams, secondary beams and decking.

  • Columns. Vertical steel members that carry the weight of the floor and everything on it down to the ground floor slab. Each column is fixed at its base to the slab.
  • Primary beams. The main horizontal members, spanning between columns and forming the principal frame.
  • Secondary beams. Lighter members, often called joists or purlins, spanning between the primary beams. They support the decking and act as its fixing points.
  • Decking. The working surface. Particle board is the most common choice for storage and general use. Steel plate, open steel grating and composite concrete laid on a steel deck are used where higher loads, wear, ventilation or durability require them.

Bracing is added to stop the frame moving sideways. Secondary beams are frequently cold-formed steel sections: C shaped profiles rolled from galvanised strip steel, generally between 0.9 and 3.2mm thick. These are a different product from hot-rolled sections such as universal beams, and the choice between the two depends on the loads and spans involved.

How do loads travel from the floor to the ground?

Every load on a mezzanine floor follows the same path: from the decking into the secondary beams, into the primary beams, down the columns and into the slab and ground beneath.
What this means in practice:

  • Loads spread across the deck are gathered into a small number of concentrated point loads, one at the foot of each column.
  • Column spacing sets the size of those point loads. Wider spacing means fewer columns below the floor but larger beams and heavier loads on each column. Closer spacing reduces beam sizes and column loads but places more obstructions in the space underneath.
  • Moving and concentrated loads must be accounted for. Approved Document A states that “loads used in calculations should allow for possible dynamic, concentrated and peak load effects that may occur”, which applies to pallet trucks, conveyors, automated equipment and racking placed on the deck.

The legal requirement behind this is Requirement A1 of the Building Regulations, which requires that loads are “sustained and transmitted by it to the ground safely”.

Transcript

Every load on a mezzanine floor follows the same path, from the deck all the way down to the ground.
It starts with the decking. That’s the surface people walk and work on, and where goods are stored.
The decking sits on secondary beams, sometimes called joists. They pass the load to the primary beams, which form the main frame. The primary beams pass it to the columns. And the columns carry it down, through steel base plates, into the existing concrete slab… and the ground beneath it. So, what does that mean in practice?
First, loads spread across the whole deck end up concentrated at a small number of points. One at the foot of each column.
Second, the spacing of the columns sets how heavy each of those point loads is. Wider spacing means fewer columns in the space below. But it also means larger beams, and a heavier load on every column. Closer spacing means smaller beams and lighter loads, but more columns in the way underneath. Third, the design has to allow for loads that move or concentrate. Pallet trucks, conveyors and automated equipment move across the deck, and racking concentrates weight onto small areas. Both have to be allowed for in the calculations. That’s why the column layout and the existing slab are so closely linked. The slab has to carry every one of those point loads safely. And this isn’t just good practice. The Building Regulations require every load to be carried safely to the ground.

Is a mezzanine floor attached to the existing building?

Most industrial mezzanine floors are freestanding: they stand on their own columns and do not rely on the walls, roof or frame of the host building for support.

This is established industry practice rather than a regulatory requirement. The reasons are structural. The frame of an existing warehouse or factory was designed for its own roof, cladding and wind loads, not for an additional floor. Using it to carry a mezzanine would mean checking and, in many cases, strengthening the existing structure.

Connection to the building is possible where it is justified. It applies if the design includes a check of the existing structure that confirms it can take the added loads. A related form, the rack-supported floor, uses storage racking as its supporting structure; Approved Document B refers to these as “raised, free-standing floors (sometimes supported by racking)”.

A freestanding mezzanine is still affected by the building around it. Clear height to the lowest obstruction, such as roof haunches, purlins or roof lights, sets how much headroom is available above and below the deck.

What role does the existing concrete slab play?

The existing ground floor slab acts as the foundation for a mezzanine floor, so its capacity often determines the column layout and the size of each base plate.

Each column stands on a steel base plate anchored to the slab, which spreads the column load over a larger area of concrete. The slab has to carry that load without cracking, bending excessively or failing locally around the plate. Where it is not adequate, the options include larger base plates, more columns, local thickening of the slab, new pad foundations or piling.

When are piling or new foundations needed?

Piling is needed when neither the existing slab nor the ground directly beneath it can carry the column loads.
Piles are columns of concrete driven or drilled down to stronger soil or rock, and their type and depth follow a ground investigation. Piling adds cost, time and disruption, and is most often triggered by heavy loads, a second mezzanine tier, poor ground or a thin slab in an older building.

How is a mezzanine floor kept stable?

A mezzanine floor has to resist sideways movement as well as vertical load, and the design must show how that lateral stability is achieved.

Sideways forces come from people and equipment moving across the deck, braking pallet trucks, accidental impact at ground level and uneven loading. Stability is provided in one of three ways:

  • Bracing. Diagonal steel members between columns, which are the most common approach on freestanding floors.
  • Moment-resisting connections. Rigid joints between columns and beams that resist movement without diagonal members.
  • Connection to a stable structure. Tying into an existing structure, which applies only where that structure has been checked and shown to be capable.

Bracing positions matter operationally because diagonal members block the space they cross. Where clear aisles, doors or conveyor routes are needed below the floor, bracing has to be placed around them or replaced with rigid connections, which usually increases steel weight.

Which regulations and design standards apply to the structure?

In England, the structure of a mezzanine floor must meet Part A of the Building Regulations, and building regulations approval is required for the installation.

Approved Document A, the official guidance on Part A, recognises design to the Eurocodes with their UK National Annexes. For a steel mezzanine, the relevant parts are:

  • BS EN 1990: basis of structural design
  • BS EN 1991-1-1: imposed loads on buildings
  • BS EN 1993-1-1: design of steel structures, including part 1-3 for cold-formed members and part 1-8 for joints

The imposed load is set by the intended use. As an example, the UK National Annex gives 2.5 kN/mยฒ for general office floors, while storage areas fall into a separate category with their own values. BRE Digest 437, Industrial platform floors: mezzanine and raised storage, published in 1999, is the specific industry guidance on mezzanine imposed loading and chipboard decking. The Storage Equipment Manufacturers’ Association bases its inspection recommendations on it.

The design load should be shown on a load notice displayed on the floor. Wales, Scotland and Northern Ireland have their own building regulations and guidance, which differ in detail.

Does the structure need fire protection?

Whether a mezzanine structure needs fire protection depends on how the floor is used, how large it is relative to the space it sits in, and whether the building has sprinklers.

In England, Approved Document B allows a single-tier floor used only for storage, by a small number of people who are not members of the public, to go without the normal fire resistance if it stays within set size limits. Outside those conditions, the structure needs fire resistance, commonly provided by a fire-rated ceiling beneath the deck, casings around the columns and fascia along the exposed edges.

How does the structure change with a second tier?

A second tier makes the structure substantially more demanding, because the columns supporting the upper level carry the combined loads of both decks down to the ground floor slab. The frame has to be designed as a whole across all levels, and the slab is frequently the limiting factor. Two tiers also require around eight metres or more of clear height, compared with around five metres for a single level.

What does the structure need once it is installed?

A mezzanine floor needs regular inspection to confirm that it is being used within its design load and that its structural parts remain in good condition.

Guidance from the Storage Equipment Manufacturers’ Association, based on BRE Digest 437, recommends inspections at least monthly, an annual condition survey and a structural appraisal every three years. A change of use, new equipment on the deck or a heavier stored product requires the structural design to be checked again before the change is made.

When is a standard mezzanine structure not suitable?

A standard freestanding steel mezzanine is not suitable where the building, the ground or the intended use cannot accommodate the loads and layout it requires.

  • Inadequate slab or ground. If the slab and ground cannot carry the column loads and piling would cost more than the space is worth, the case for a mezzanine weakens.
  • Insufficient clear height. Below around five metres of clear height, usable headroom on both levels is difficult to achieve once the depth of the steel frame and any services are allowed for.
  • Heavy dynamic or vibrating loads. Machinery that vibrates or produces heavy dynamic loads requires a specific structural design and heavier decking, and in some cases is better placed at ground level.
  • Large column-free spans below. Operations that need large, column-free areas beneath the floor, such as vehicle movements or wide conveyor runs, require long-span beams, which increase steel weight and cost.

A mezzanine does not resolve problems in the existing building. A slab that is cracked, uneven or poorly drained needs addressing first, because the mezzanine depends on it.

FAQs

  • A mezzanine floor is an intermediate raised platform inserted between the floor and ceiling of an existing building. It typically uses structural steel columns and beams, a deck (often timber decking), stair access, edge protection (handrails, barriers) and sometimes walls or partitions. It doesnโ€™t constitute a full storey in legal terms but adds significant usable floor area internally without altering the building footprint.

    Hi-Level Mezzanines designs and installs bespoke mezzanine floors for large-scale commercial and industrial projects.

    • Planning and Installation
    • Sectors and Applications
    Copy link

Related Resources

Contact Us

Enquiry Form

Quote Request

Quote Request

Your Details


Supporting Files

Please attach any supporting drawings, plans and photographs that may be of assistance to us in preparing your quote. Simply click on the choose files button below to locate these files on your computer or network.


Looking for a budget mezzanine price?

Use our simple budget calculator below to get an instant mezzanine floor costing.