When is piling required for a mezzanine floor installation?

Summary

Piling is required for a mezzanine floor when the ground beneath the existing slab cannot carry the column loads without unacceptable settlement, or when the loads are too heavy for the slab and for shallow pad foundations. There is no fixed load or floor size at which piling becomes necessary. The decision follows a ground investigation and the structural design, and piles are placed beneath the column positions that need them.

Contents

What is piling?

Piling is a type of deep foundation that carries loads down through weak ground to firmer soil or rock beneath.
A pile is a column of concrete installed vertically into the ground. It carries load in one of two ways, or a combination of both:

  • End bearing. The pile rests on a firm layer, such as dense clay, gravel or rock, and the load is carried at its tip.
  • Skin friction. The load is carried by friction between the ground and the length of the pile shaft.

Pile depths range from around three to thirty metres, depending on how far down suitable ground is found.ย The Concrete Societyย summarises the principle: “Where the bearing capacity of the soil is poor or imposed loads are very heavy, pile foundations are required.”

When is piling required for a mezzanine floor?

Piling is required when neither the existing slab nor a shallow foundation can carry the mezzanine’s column loads without unacceptable settlement.ย The common triggers are:

  • Poor ground. Soft, compressible or variable ground beneath the slab. The British Geological Survey notes that where compressible ground is not uniform, “different parts of the building will sink at different rates”.
  • Made ground. Land that has been filled or reclaimed. Made ground is often placed in an uncontrolled way and varies in composition, which makes its behaviour under load hard to predict.
  • Heavy loads. Multi-tier mezzanines, dense storage and heavy automated storage systems produce column loads well above those of a single-tier storage floor.
  • Wide column spacing. A wider column grid creates fewer but heavier column loads. A grid chosen to keep the space below open can push individual loads beyond what the ground can carry at shallow depth

No regulation or standard sets a load at which a mezzanine must be piled. The requirement comes from comparing the column loads with what the ground investigation shows the ground can safely carry.

Transcript

Piling is needed when neither the existing concrete slab, nor a shallow foundation beneath it, can carry the mezzanine’s column loads without settling too much.
Piles get round that by carrying the load down through weaker ground, to firmer soil or rock below.
So what usually triggers it? There are four common reasons.

The first is poor ground. If the soil under the slab is soft, compressible, or varies across the site, different parts of the building can sink at different rates.
The second is made ground. That’s land that has been filled or reclaimed in the past. It’s often been placed without much control, so it’s hard to predict how it will behave under load.
The third is heavy loads. A multi-tier mezzanine, dense storage, or a heavy automated storage system puts far more weight on each column than a single-tier storage floor.
The fourth is wide column spacing. Spacing the columns further apart keeps more of the space below open. But it means fewer, heavier column loads… and those can go beyond what the ground can carry at shallow depth.

What’s worth knowing is that there’s no set point at which a mezzanine has to be piled. No regulation or standard gives a load, or a floor size, that makes it automatic.

Instead, it comes down to a comparison. The column loads from the design, against what a ground investigation shows the ground can safely carry. If the ground can’t take them, piling is one way to make the design work.

How is the need for piling identified?

The need for piling is identified by a ground investigation, carried out after the slab has been assessed and found not to be adequate on its own.

A ground investigation uses boreholes or trial pits to establish the soil and rock layers beneath the building, their strength, and how much they will compress under load. In the UK, BS 5930 is the code of practice for ground investigations. Where piles are being considered, the investigation needs to go deeper than the expected pile length. NHBC Foundation guidance on piled foundations sets the minimum investigation depth as the greatest of the pile length plus five metres, the pile length plus the foundation width, or the pile length plus three pile diameters.

The quality of the investigation matters. In the same NHBC Foundation research, pile designers reported that ground investigation quality “was often insufficient”, which can lead to longer or more piles than necessary.

What are the alternatives to piling?

Piling is usually the last option considered, after design changes and shallow foundations have been ruled out.

  • More columns. Closer column spacing reduces the load on each column base.
  • Lower design loads. Reducing the specified floor loading, where the intended use allows, reduces every column load.
  • Larger base plates. Spreading each column load over a larger area of the existing slab.
  • Pad foundations. Breaking out the slab at each column position and casting a concrete pad beneath it. Pads work where reasonable ground is found at shallow depth, and are typically between 600mm and two metres deep.

These options are less disruptive than piling. Piling becomes the preferred route where suitable ground is too deep for a pad, or where the alternatives would compromise how the space below the mezzanine needs to be used.

Which types of pile are used inside existing buildings?

Inside an existing building, the choice of pile is limited by headroom, access and the need to control noise and vibration.

  • Bored piles. Formed by drilling a hole and filling it with concrete. Smaller-diameter bored piles can be installed with rigs that work in tight and confined spaces.
  • Continuous flight auger (CFA) piles. A type of bored pile installed with a continuous auger, with limited noise and vibration.
  • Mini piles and micropiles. Small drilled piles with a diameter under 300mm, installed with compact rigs suited to confined spaces. Typical working loads range from around 50 to 500 kN per pile.
  • Driven piles. Hammered or pushed into the ground. They generally need significant headroom and produce more noise and vibration, which makes them less common inside occupied buildings.

The rig also has to reach each column position through existing doors and aisles, and the existing slab has to carry the rig while it works.

How is a pile connected to a mezzanine column?

A pile is connected to a mezzanine column through a pile cap, a thick block of reinforced concrete that sits on top of one or more piles and spreads the column load into them.

In an existing building, the slab is broken out at the column position, the pile or piles are installed, and the cap is cast to finish level with the surrounding floor. The mezzanine column’s base plate is then fixed to the cap with grouted anchor bolts. Where a column load is large, a single cap can sit on a small group of piles rather than one.

Are piles tested?

Piles are tested where the level of risk justifies it, and the extent of testing is decided by the designer.
Federation of Piling Specialists guidance states that the scope of testing depends on “the complexity of the foundation solution, the nature of the site and the consequences if piles do not meet the specified requirements”. On low-risk sites, testing can be limited to routine compliance checks.

Two methods are common:

  • Integrity testing. A sound wave is sent down the pile to detect cracks, inclusions or narrowing of the shaft.
  • Static load testing. A pile is loaded beyond the load it is designed to carry, and its settlement is measured.

What does piling involve in an operating building?

Piling inside an operating building involves breaking out sections of floor, running heavy plant and removing excavated material, all of which has to be planned around the operation.

  • Slab breakout. Each column position needs the slab broken out and reinstated.
  • Noise and vibration. Rigs and breakers produce noise and vibration. BS 5228-1 and BS 5228-2 are the codes of practice for controlling them on construction sites.
  • Dust. Cutting and breaking concrete produces silica dust, which needs controls such as water suppression and extraction.
  • Spoil. Excavated soil has to be removed from the building and disposed of, which adds cost.

Exclusion zones. Rigs need exclusion zones to keep people and vehicles away from moving plant.

Which standards apply to piling?

Pile design and installation in the UK follow the Eurocode for geotechnical design and a set of execution standards for each pile type.

  • BS EN 1997-1: Eurocode 7, geotechnical design. A second-generation version, BS EN 1997-3:2025, which covers piles, has been published, and the industry is in a transition period between the two.
  • BS 8004:2015+A1:2020: Code of practice for foundations, covering spread foundations, pile foundations and underpinning.
  • BS EN 1536, BS EN 12699 and BS EN 14199: Execution standards for bored piles, displacement (driven) piles and micropiles respectively.
  • SPERW: The ICE Specification for Piling and Embedded Retaining Walls, third edition (2016), the specification commonly used on UK piling contracts.

Piled foundations form part of the mezzanine’s structure and are included in the building regulations submission for the installation.

When is piling not the right answer?

Piling is not the right answer when a less disruptive option can carry the loads, or when the cost of piling outweighs the value of the space created.

  • If more columns, lower design loads, larger base plates or pad foundations can carry the loads, piling adds cost and disruption without benefit.
  • If the ground is poor across the whole building and loads are heavy, the cost of piling every column can make a mezzanine uneconomic compared with other options, such as reducing the load or using a different part of the building.
  • In a leased building, breaking out the slab and installing piles usually needs the landlord’s consent under the lease, which may not be given.

Piling supports the mezzanine columns only. It does not strengthen the rest of the existing floor or correct defects in it.

FAQs

  • A mezzanine floor is an intermediate raised platform inserted between the floor and ceiling of an existing building. It typically uses structural steel columns and beams, a deck (often timber decking), stair access, edge protection (handrails, barriers) and sometimes walls or partitions. It doesnโ€™t constitute a full storey in legal terms but adds significant usable floor area internally without altering the building footprint.

    Hi-Level Mezzanines designs and installs bespoke mezzanine floors for large-scale commercial and industrial projects.

    • Planning and Installation
    • Sectors and Applications
    Copy link

Related Resources

Contact Us

Enquiry Form

Quote Request

Quote Request

Your Details


Supporting Files

Please attach any supporting drawings, plans and photographs that may be of assistance to us in preparing your quote. Simply click on the choose files button below to locate these files on your computer or network.


Looking for a budget mezzanine price?

Use our simple budget calculator below to get an instant mezzanine floor costing.